Before and after gallery 4
Bathroom Installation Project Four


Before
The intention was to install the new suite in the same position as the old. There was extensive water damage to the floor below the shower tray and at least half the floor boards in the room had to be replaced. The 2x12 inch joist directly below the shower tray had also been damaged and needed to be strengthened. This was done by gluing and bolting 2x10 inch joist material either side of the damaged joist. Whilst the floor boards were up, all the pipe work alterations were made in preparation for the new suite and the change of position of the radiator.


